Search

Search all blog posts here.

Search This Blog

Saturday, September 18, 2010

Forks together and bar mock up

Freshly powdercoated parts!






First stop, the bath tub. I think the powdercoater washed everything, but you have to make sure that there is not blast media or loose powder in your sliders.




Fork legs laid out. (and who works in shower shoes?)

The bolt goes through the slider, the spacer inside the slider and threads in the end of that rod.


Snug this hand tight. (We can't torque yet without a special tool.)


There is a sleeve that has to be driven until it bottoms out.

Then a big washer sits on the sleeve.(not pictured)

A new fork seal.



Put a plastic bag over the end of the tube and lube with fork oil to avoid nicking the new seal on the edge of the tube. Be sure that you put the seal in facing the correct direction. Looks like the old ones had little twin squares marks up.


Drive the seal in. I have to give a shout out to Okie Smoke for lending me the 41mm driver.

Seat the seal until the ring groove shows.


Put the snap ring in.


Treat the wiper seal like the oil seal.


Get it seated.


Spring goes in.


Washer and spacer next...


Plug on the end.


This little ring holds it all together.


Shove the plug down past the ring groove and have your wife put the ring in the groove.


What no fork oil????
Remember we didn't torque the bottom bolt?
The spring tension holds everything together so you can torque the bolt without everything spinning.
Add a drop of blue loctite and torque the bolt to 14.5 ft*lb. I should have bought two new copper washer for those, but I'll take my chances.

Now push the end plug down and have your wife pull out the ring and take out the plug, spacer, washer, and spring out.
Here's what you need to fill the forks with oil. Fork oil and a leveler. Mine's shop build and uses a Mity-Vac.


The Clymer manual said 460ml and a height between 5.31 and 5.47 inch.


Again put everything else back in the fork and have your wife put the ring in while you shove everything together.

Now to really built the front end. This cover goes there.
New covers.


Through the bottom tree.


Hmmmmm... these covers may not stay, depending on how the rest looks with it.


These Drifter rubbers are stubborn.


Put the top tree on and torque the bolt.


Push the tubes even with the trees.


Torque all the pinch bolts.


Four bolts puts the fender on.(We're be cutting that one down, too.)

Put the wheel on, not completely just for mock up.


Handlebar clamps.


Top clamp and bars.


New stainless clamp bolts.


Perfect window frame to see the word through.

Saturday, September 11, 2010

Bobbing a rear fender

Okay, it's time to really make this bike into a bob-job. I put this first picture in just to show everybody how short the frame struts for the fender are.


Basically you could easily do any 7 1/2 or 8 inch fender you wanted any of these ways.


PhotobucketPhotobucketPhotobucketPhotobucket

I am wanting to keep a spot that could still hold a pillion or rack. So I want mine to look more like a hinged fender with the hinged section of the fender gone. Like these...

PhotobucketPhotobucket



So here's my good fender, it's going in to the attic in case I want to run the stock sheetmetal later.


Here's my fender to get cut.(Man those colors are ugly.)


First I wanted to mock up my new light. I put my pillion on a sissy bar on to make sure it would all fit together. I'm not wanting to run either, but I have them and my four year old son may need those on to ride a little next spring.


Put I so tape on, not to save paint, but to be able to mark things.



First marks, for reference only.


Make sure everything is square and even. There are two holes for the stock tag mount and those will be our datums for everything.

Center marked.



Now to really mark the light's position.


The marks are wierd, because the chinese taillight bracket holes are wierd.


The light is placed. Now to cut the fender.


We found a nice reference point, where the fender flares to meet the struts.


With both sides marked, we ran a kite string across the fender.


Check that everthing is as even as possible.


Back off and make sure it looks right.


Mark the line along the string.


TAKE THE FENDER OFF THE BIKE OR THE REAR WHEEL OFF BEFORE YOU START CUTTING!

Put the cutting wheel on the angle grinder and get to it.


Cut to the outside of the line.

Almost there.

Now get the grinding wheel and finish it up.




Hammer these end edges flat.


Mock up the "new" fender.


I would normally say take the fender off before you drill holes, but with the bike on the jack the tire is a mile away from the area to be drilled.
Center punch my marks from earlier.


Uni-bit, just like OCC.


De-burr the holes.

Bolt the taillight on, and some put some tape on to mark a hole for the wiring.

Mark the center again.


I have a grommet that needs a 1/2 inch hole, so centerpunch, drill, and deburr again.


Route the wires and put the grommet in.

Perfect! It's sitting a little high, because it's on a jack. I would put it down off of the jack, but the front end is still with the powdercoater.

Harley grips should fit Vulcans

A while back I bought these cool Harley grips at swapmeet, thinking they would fit right on to the Vulcan. I mean both run 1 inch bars and CV carbs, right? Turns out they aren't a straight bolt on. The slidey part of the HD grip is too big for the Kawasaki throttle housing.

Photobucket

I measured the Kawasaki hole at about 1.200inch and the HD at about 1.400inch. I figure my marker tip is about 0.050 inch. So I will make it once and cut it, see where that puts me and do it again.






Not my prettiest work, but it should work fine now.

Wednesday, September 8, 2010

1500 Vulcan tank seam rolling

Okay, here it is. Actually took me longer to clear the workbench than to do the work, but my arm is sore now.



Still needs stripped and prepped, but so far so good.