Search

Search all blog posts here.

Search This Blog

Saturday, January 29, 2011

Back of the oil bag

Chase this hole with pipe thread tap.


Smoke these fittings down.


Looking good, but we are still short a plug for the last hole.


Now to plan our all-thread studs for the back of the oil bag.


Center punch...


Center drill...


Drill...


This one doesn't line up, but other side did. We had to put the hole in the frame in this location, so something is not quite even, either the frame or oil bag, no surprise either way.



Make a new hole for it.


Now we can put the nuts on the mounts and cut the all-thread to length. I love my right angle attachment and EZ Lock cut off wheels for my Dremel.

We'll need more nuts, washers, and red loctite , but otherwise we're good to go. Plumbing the oil lines and running the wires will be next.

No comments:

Post a Comment