Search

Search all blog posts here.

Search This Blog

Tuesday, November 13, 2012

CT70 Battery Set-up

Time to figure out the battery situation for the Trail 70. I pulled this little 6volt sealed battery out of my Trail 90. I like these sealed batteries better than the acid type for sure.


It's rated higher than needed, 5Ah instead of 3Ah, but it fits in the battery box with all the stock rubbers perfectly on the red bike. That's good because I have to shim it up to fit the Trail 90 battery box.


Seems like it will clear the seat pan, too.




This is were things got different from what I was expecting. I thought all Honda's had green ground wire and a lead that went straight from the negative of the battery to bolt to the frame. That's not case with the K0. The negative on the battery goes to blue wire to ignition switch and the negative leads doesn't connect to frame for the chassis ground until you turn the key on. Not what I am used to, but easy to work with once you know. I'll need to reinstall the ignition switch before anything will work.


I found the lead for the battery for the main harness.


Found the terminals I needed.


I learned about soldering wires from a Bikernet article and how to build a helper.


So first move is to lengthen the blue lead.








Now add the terminals.






Add a terminal to the blue lead too.


Ready to go. I will wrap the positive side with electrical tape to cover the exposed metal.


Sunday, November 11, 2012

OKC Veterans' Day Run to the Capitol 2012

This year the run started a VA Hospital instead of the Skyline Cafe. The turnout was sparse compared to the same run in 2011. I'm not sure if it was rainy cold weather, lack of publicity, or confusion on which day, the holiday on Sunday the 11th or the observed holiday of Monday the 12th. It does really matter to me I do this run every time I possibly can. I even had a little incident earlier in the day that couldn't stop me.


Up to the Veterans' Memorial at the Capitol complex.




The view from the memorial to the capitol building.


Getting started.




Representatives of the Paralyzed Veterans of America did a lot the ceremony.


The invocation.


Presentation of colors.






Representative Gary W. Banz of Oklahoma House of Representatives - District 101 was the keynote speaker.





American Legion Riders Representative.




A check presented to the Wounded Warrior Project.


Benediction.


Relatively Minor Unplanned Get-off

Well in was wet and nasty, but it had quit raining. I was going maybe 20 to 30 approaching one of those round-about deals. Columbus(Warpig62) was in front of me and we needed to slow, not stop, to enter the round-about. Evidently there was bunch of oil of something besides just water to make the road especially slick. I just touched my brakes to slow and I was on the ground.  My ankle was pinned under the fender strut and saddlebag. My ankle wasn't injured or hurting luckily, but I couldn't reach the handlebars to get the bike off me. I was about to try and slide my foot out of my boot when Columbus came back and got the bike off me. Handlebars are tweeked, lightbar toast, and the trim on my headlight scuffed. My right shoulder hurts if I raise about my hand above my shoulder. I did still go on and do the Veterans' Day Run.





I was just talking about how these pants weren't as waterproof as they used to be. The boot damage didn't get to the steel toe. This would have been painful in shorts and flip-flops.


That will buff out.



Saturday, November 10, 2012

Fatboy Front Wheel to Chopper Rear Wheel

This is how you make a fatboy front wheel work on the back of your choppa. The work and pictures were done by Columbus(Warpig62), but he can't figure how to blog or post pictures on the shovelhead forum. So I had to help.

First get a front wheel. $30 special right here.


U drill bit for the 7/16-16 UNC tap. 5/16 drill bit for the 3/8-16 UNC tap.


The sprocket side will be the side that sticks out more and has the lettering(if it hasn't been polished). Center up on the existing hole and drill with the U bit about 1.00 inch deep.




Tap the hole to 7/16-16 UNC. Had to use a very short dead center, because the drill-mill didn't have a deep enough drop.


Center up with a small drill bit for a dead center when it got deeper.


This tape is used to mark how deep to go with the tap. Should have done this before we started tapping.


Flip the wheel over to do the rotor side.


This side needs 5/16 drill and 3/8-16 tap. Keep the drill and taps straight as always.




Drill and tap them all and a front rotor goes no problem.

The sprocket side needs more attention. The spacer holes need to be drilled out 7/16 or maybe one step bigger. Paul Jr. uses a Uni-bit for everything and he's a badass builder, right?


The step on the sprocket side is about 2.300 inch so standard chain sprocket will not quite fit.




Needs to be opened up to about here.


Yes, Columbus has a mill and a lathe, but chose to go poor boy just to show a garage builder how to do it. Mark the area around the hole with red sharpie. Cover the marker with soapstone. A compass or caliper may then be used to mark the difference in the radius that's there and the one you need. This needs to done to both sides of the sprocket.

 

I used a dremel to remove some of the stock using the lines on both sides to gauge the depth of the cuts.
Taking your time here will pay off BIG in the end. Once you go all around, use a 1/2 round rasp to hog out the material down to your scribe lines. Once you get close, do some test fitting to ensure as exact a fit as you can.

 

What do you know...dang thing fits!



This choppa is going to be awesome.

Tuesday, November 6, 2012

Shovelhead 4 Speed Saga Part 2c - 4th Gear Double Seal

Here's another one of Ray's "Saddlebagrail" tricks to stop a four speed from leaking, two seals instead of one seal in the main drive gear where the mainshaft runs through the middle of it. The counterbore for the shelf is 1.250 inch in diameter and the inner diameter of the bushing that the mainshaft rides in is 1.000 inch in diameter. The counterbore is basically 7/32 or 0.21875 inch deep.


The seal is just under 0.200 inch thick.


Here's the new counterbore all the way to 7/16 or 0.4375. Again there are a lot of ways to do this depending on your skills and equipment. This was done, like my kickershaft counterbore, with a CNC mill via circular interpolation. The project would be well suited for a manual lathe as well.


Primer, retaining compound, and two seals. Use as directed.


Fancy seal driver. Once and...


again.